Commit Graph

4 Commits

Author SHA1 Message Date
unkin-agent 4ff55f052a Fail a bare invocation when stdout is not a terminal
ci/woodpecker/pr/build Pipeline was successful
ci/woodpecker/pr/test Pipeline was successful
ci/woodpecker/pr/integration Pipeline was successful
ci/woodpecker/pr/pre-commit Pipeline failed
Puppet's generate() reads stdout through a pipe with combine: true, so help
text on a zero exit lands in the catalog. Help now requires an interactive
stdout; a piped one exits non-zero with nothing on stdout.

- gate the no-args help path on an isTerminal(stdout) check
- reject an explicitly empty --config instead of resolving it
- ignore a relative XDG_CONFIG_HOME, per the XDG spec
- give the integration subprocess a hermetic HOME/XDG_CONFIG_HOME
- pass []string{} to run(), so cobra cannot fall back to os.Args
2026-09-22 22:50:05 +10:00
unkin-agent b0aad96673 Source the CA from /ca_chain, not from issuance
ci/woodpecker/pr/build Pipeline was successful
ci/woodpecker/pr/integration Pipeline was successful
ci/woodpecker/pr/test Pipeline was successful
ci/woodpecker/pr/pre-commit Pipeline failed
Deriving ca_certificate from an issue response welds CA distribution to
per-node renewal, so a rotation takes ~90 days to reach the estate, and
issuing_ca is the intermediate alone, which strict path builders reject
as a CAfile.

- add a `ca` subcommand printing {mount}/ca_chain as PEM, unauthenticated
- drop ca_certificate from the issue document and its file output
- order full_chain leaf first
- require only vault.addr for the CA path via config.LoadCA
2026-09-19 13:27:47 +10:00
unkin-agent 35e4c58305 Keep test/integration buildable without the integration tag
ci/woodpecker/pr/integration Pipeline was canceled
ci/woodpecker/pr/build Pipeline was successful
ci/woodpecker/pr/test Pipeline was successful
ci/woodpecker/pr/pre-commit Pipeline was successful
2026-09-19 12:20:27 +10:00
unkin-agent 618e1414e4 Release via goreleaser; test against a real Vault
ci/woodpecker/pr/test Pipeline was successful
ci/woodpecker/pr/pre-commit Pipeline failed
ci/woodpecker/pr/integration Pipeline was canceled
ci/woodpecker/pr/build Pipeline was successful
Replace the nfpm script with .goreleaser.yaml as the single driver for the
RPM, the raw release binaries the compiler initContainer fetches, archives
and checksums. Add an end-to-end test that issues a certificate from a real
Vault dev server over approle.
2026-09-19 12:12:25 +10:00