Neither repo has a test workflow, so the required ci/woodpecker/pr/test
context never reports and every PR stays permanently unmergeable.
- Remove ci/woodpecker/pr/test from status_check_contexts on both repos
- Keep ci/woodpecker/pr/build and ci/woodpecker/pr/pre-commit